Earthwork savings on a single project
Earthwork & Tracker Optimization
Pile-adaptive grading analysis reduced earthwork volume by 70% — from 118,000 m³ to 35,000 m³ — across a tracker-based utility-scale site with challenging hard-rock terrain.
Read Case Study →Shading loss difference across spacing scenarios
Shading, Cable Length & DC Power Balance
A 130 MWp plant analysis quantified the trade-off between inter-row spacing, shading losses, and cable cost — enabling data-driven GCR decisions with terrain-aware context.
Read Case Study →Cable cost reduction via topology optimization
Cable Routing Optimization
Comparing three cable string topologies — Line, U-shape, and Leapfrog — across a complex terrain site identified a $430K savings opportunity through 14% shorter total cable runs.
Read Case Study →More energy from tracker configuration
Tracker vs Fixed-Tilt with BESS
A terrain-aware comparison of single-axis tracker vs. fixed-tilt configurations — including battery storage integration — quantified energy and cost trade-offs across difficult terrain.
Read Case Study →See these results on your project